Panorama Lift Project

Last summer, we replaced the drive and braking systems in addition to new controls on Panorama.  This summer, we will complete the mechanical upgrades with a new hydraulic tensioning system.  In order to prep for this, our lift mechanics de-tensioned the lift and removed the counterweight.  The haul rope was then lowered to the ground so that a splice can occur to take slack out of the system prior to the new hydraulic installation.