19°
29"
0"
0"
Snow Report
 

Panorama Lift Project

07 July
Categories : Mountain Ops
Posted by Scott Pressly

Last summer, we replaced the drive and braking systems in addition to new controls on Panorama.  This summer, we will complete the mechanical upgrades with a new hydraulic tensioning system.  In order to prep for this, our lift mechanics de-tensioned the lift and removed the counterweight.  The haul rope was then lowered to the ground so that a splice can occur to take slack out of the system prior to the new hydraulic installation.