The Panorama Hydraulic Tensioning System ground installation is complete. The foundation is set and the tower has been installed along with the hydraulic ram. A load and acceptance test will be performed by the Colorado Passenger Tramway Safety Board prior to our annual licensing and inspection. Things should be a lot more streamlined on the downhill side of the bottom terminal and the ride to the Divide just got a little smoother!