snowflake icon 20°
35"
4"
2"
SHOP
Conditions
 

Pano Hydraulic Tensioning

22 July
Categories : Mountain Ops
Posted by Scott Pressly

The Panorama Hydraulic Tensioning System ground installation is complete.  The foundation is set and the tower has been installed along with the hydraulic ram.  A load and acceptance test will be performed by the Colorado Passenger Tramway Safety Board prior to our annual licensing and inspection.  Things should be a lot more streamlined on the downhill side of the bottom terminal and the ride to the Divide just got a little smoother!

Monarch Mountain is an equal opportunity provider and operates under a special use permit with the Pike San Isabel National Forest.
Anyone who needs assistance with accessing the content on this website please call 719.530.5000.