snowflake icon 21°
35"
4"
2"
SHOP
Conditions
 

MCS Road Building

24 November
Categories : Mountain Ops
Posted by Scott Pressly

The Monarch Cat Skiing snowcat operators started the process of building the over the snow roads into our permitted area. This operation usually takes several weeks to build out the entire system as the cat operators farm snow from our snow fences and fetch fields to use for the roads. The system of roads includes drop-off roads on the ridge lines and pick-up areas down below. The MCS permitted area covers both sides of the Continental Divide.

Photos from 11-17-18:

Pushing out to Frog Rock

Top of Dog Heaven

Monarch Mountain is an equal opportunity provider and operates under a special use permit with the Pike San Isabel National Forest.
Anyone who needs assistance with accessing the content on this website please call 719.530.5000.